By Polished Concrete Floors Perth · 9 September 2026 · Planning guidance
Map the building constraints
Record loading access, lift dimensions, available power, building rules and permitted work windows. Check these with the manager before booking the job.
Separate people and work
Grinding requires a suitable silica control plan and appropriate work-zone isolation. Staged access needs a site-specific assessment; an open business cannot simply operate beside uncontrolled work.

Define a practical handover
Agree return-to-use conditions, protection responsibilities and cleaning instructions. Plan stock and furniture movement after the relevant product and site requirements have been met.
Take this to your assessment
Bring photographs and a short description of how the space is used. Ask which assumptions need a site visit or trial, and have the agreed answer included in the written scope.
This guide supports project planning. Confirm the selected products, substrate requirements and installation instructions with the supplier.

