House and Extension Slabs
Slabs for new builds and extensions, set out and poured to the engineering requirements for your site, with reinforcement and thickness matched to the loads the slab will carry.
PERTHPOLISHED CONCRETE FLOORSIt starts with the ground
Concrete slabs in Perth: house slabs, shed and garage pads, extensions and outdoor areas, from site preparation and formwork through to pour and finish.

Start with your space
A concrete slab is only as good as what sits under it. Base preparation, compaction and drainage decide whether a slab performs for decades or starts moving within a few years, which is why the groundwork matters more than the pour itself.
Perth soils vary considerably across the metropolitan area, from sand to reactive clay, and the slab design has to respond to what is actually on your block. Reinforcement, thickness and footing detail all follow from that.
Slabs are poured for houses, extensions, sheds, garages, patios and outdoor areas, each with different loading and finish requirements. The intended surface finish should be agreed before the pour, since some finishes are created during it rather than afterwards.
An approximate area is fine. The right system starts with an assessment.
A little more clarity
Good decisions start with a clear understanding of your floor.
That depends on what it carries and the ground beneath it. A patio pad and a slab taking vehicles or machinery have quite different requirements, and the engineering should determine it rather than a rule of thumb.
Concrete gains strength over time and the usable point depends on the mix, the loads and the weather. Your contractor should confirm the timing for your specific pour.
Fine shrinkage cracking is normal and largely managed with control joints and reinforcement. Structural cracking usually points to inadequate base preparation or unaccounted ground movement.
Often yes, but it is far easier if the intent is known before the pour, since the mix, the finish and the flatness all affect what is achievable when polishing.
For structural slabs, generally yes, and often for approval as well. Your contractor can tell you whether your project requires engineering and inspections.
Typically excavation to level, removal of unsuitable material, imported fill where needed and compaction. What is required is established by looking at the site rather than assumed.

A short quote can leave important decisions unresolved. Compare the actual preparation, system and handover expectations before choosing a contractor.
Read guide
A useful budget starts with a defined scope, not an unexplained square-metre rate. Here is what to compare when planning a Perth floor.
Read guide
Similar-looking floors can have very different wearing surfaces. Understand where the appearance comes from before comparing price and maintenance.
Read guide